pile drills

JACBO-S

Auger pile drill, with small central tube, diameter 30–100 cm. Generally, pile construction is performed using structural connecting reinforcements. Depending on the pile diameter, reinforcement lengths of up to 12 m are available upon request. Minimum distance from neighbouring structures etc. 75–100 cm, depending on pile diameter.

JACBO-O

Partial displacement pile drill, with large central tube, diameter 32-60 cm. Generally, construction is performed with a structural connecting reinforcement as is the case with the auger pile drill. Minimum distance from neighbouring structures etc. 75–100 cm, depending on pile diameter.

JACBO-B

Partial displacement pile drill, with large central tube. In normal cases, construction is performed with reinforcement over the complete pile length. Minimum distance from neighbouring structures etc. 75–100 cm, depending on pile diameter.

diameters

Diameter paalJac - SJac - OJac -PJac - B
300X
320X
350X
360X
400XXXX
450XXX
500XX
520X
550XXX
600XXX
650X
700X
800X